[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (D)(7)(d) / Flow or pressure switch with a shut off valve shall be provided and tested monthly.
Critical Flow or pressure switch for a shut off valve was not tested monthly
Have the ACC unit serviced or replaced with a unit that has a flow or pressure switch with an automatic shut off valve. Provide records indicating that the unit is being tested monthly. TEST AND RECORD THE ACC PRESSURE SWITCH FUNCTION MONTHLY. Correct By: 30-Nov-2018


Inspection Information


Facility Type: Special Use

[?] Inspection Type: Standard

Inspection Date: 31-October-2018