Inspection Information
Facility Name: Home 2 Suites
Facility Type: Pool
[?] Inspection type: Follow-up
Inspection date: 28-April-2023
No violations were documented at the time of inspection.
The following violation(s) have been corrected since the last inspection.
3701-31-04 (B)(1)(e)/Automatic Chemical Controller (ACC) shall function properly.
At the time of reinspection, the automatic chemical controller (ACC) was observed displaying chlorine values in parts per million (ppm). Operator informed inspector that ACC technician will be coming out to fix the unit today (04-06-23) so it reads ORP.
On the ACC, the chlorine value shall be displayed in oxygen reduction potential (ORP). Refigure the ACC to have the chlorine read ORP values.
Comments
- Reinspection was conducted to check the status of the automatic chemical controller displaying oxygen reduction potential. At the time of inspection, the ACC was displaying parts per million, however, the display was changed to indicate ORP. Violation was corrected and is satisfactory.