[?] A summary of the violations found during the inspection are listed below.

3701-31-04 ( D )(6)(a) / ORP reading shall be 650 millivolts or greater.
Observed the ORP to be 640 mv.
Have the ACC unit inspected to determined why the ORP is low. The ORP is to be maintained at or above 650 mv.


Inspection Information


Facility Type: Spa

[?] Inspection Type: Standard

Inspection Date: 28-March-2024

Comments
The spa is open for fourteen hours a day but the disinfectant residual is tested once a day prior to bathers entering the pool/spa area. The operator was made aware and stated that they would conduct a second test per day of the disinfectant residual.