[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (D)(7)(d) / Flow or pressure switch with a shut off valve shall be provided and tested monthly.
Critical Flow or pressure switch for a shut off valve is not plugged in to chemical controller at time of inspection.
Have the ACC unit serviced or replaced with a unit that has a flow or pressure switch with an automatic shut off valve. Provide records indicating that the unit is being tested monthly.


Inspection Information


Facility Type: Pool

[?] Inspection Type: Standard

Inspection Date: 23-April-2019

Comments
As discussed at the time of inspection, the emergency telephone for the hotel pool and spa calls the front desk, which is not always occupied, increasing risk of a missed emergency call. An emergency phone does exist at the front desk, so a sign indicating its location will be sufficient for compliance.