3701-31-04 (B)(6)(f) / Required turnover rates are sufficient
Required turnover rates were not met. The flow meter read 40 gpm, required rate is 67 gpm.
Have the circulation system evaluated to determine why the turnover rates are not able to be met. Once the reasons have been determined have the issue repaired. If necessary, submit plans to the Ohio Department of Health to review and approve.
Facility Type: Pool
[?] Inspection Type: Standard
Inspection Date: 07-June-2021